The following list of road projects and maintenance resurfacing projects are currently planned. These projects are planned for unincorporated Larimer County and may result in traffic delays. The list of projects does not include work on state highways or city streets. Maintenance resurfacing projects include chipseals, slurry seals, grader patch and base stabilizations. All projects require moderate to good summer time weather and are subject to delays from weather and/or the availability of materials. Please be advised of the possibility that proposed work might not be completed in time or that additional projects could be added during the summer season. All projects are subject to change.

Road closure map  | Map of all County road closures

Flood response/repair road information: Progress to date | Work planned

Weather Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
2
CR 2
CR 21 CR 23E 06/04/15
12:00 AM

LC R&B
970-498-5650
This crossing has been damaged/destroyed during recent storm events. To schedule for replacement has been determined. Full Closure  
22H
CR 22H
9597 CR 22H CR 29 09/12/13
12:00 AM

Matt Johnson
970-498-5724
September 2013 Flood. Construction is anticipated to begin in late 2015 and be completed in mid 2016. Road is closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. Full Closure  
29
CR 29
approx. 1 mile north Hwy 34 approx. 2 miles SW of CR 27 09/12/13
12:00 AM

Matt Johnson
970-498-5724
September 2013 Flood. Construction is anticipated to begin in late 2015 and be completed in mid 2016. The approach to both sides of the bridge is damaged. Road is closed at bridge and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. NO TRUCK TURNAROUND. Full Closure  
CR 3
CR 3
CR 18 CR 20C 05/20/15
12:00 AM

Larimer County Road and Bridge Department
970-498-5653
The Big Thompson River has over-topped CR 3. We will need to wait for the water levels to recede before we can assess damage and prosecute repairs. Full Closure  
59
CR 59
County Line End of County Maintenance 09/11/13
08:00 AM

LC R&B
970 498 5650
Permanent work yet to be done. Restricted Access Only  

Recently Opened

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
27
CR 27 (Buckhorn/Stove Praire Rd)
18000 Buckhorn Rd Ohana Way 09/12/13
12:00 AM
12/24/14
12:00 AM
Matt Johnson
970-498-5724
Road is open with gravel surface as of December 24, 2014. Construction will continue throughout the winter and spring. The road will remain open with periodic delays. Paving will be in the spring. Newsletter: http://larimer.org/engineering/cr_27.pdf or Project sheet: http://www.larimer.org/engineering/projects/Stat9323.htm Open  

Construction Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
43
CR 43 (Devils Gulch)
US 34 (at Drake) Glen Haven 10/13/14
12:00 AM

Erich Purcell
970-498-5733
Work continues. Pilot cars will be leading vehicles 5 minutes after the hour.

Construction started in October, 2014. Delays are posted on Thursdays for the upcoming week. For Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9386.htm, http://larimer.org/engineering/cr_43.pdf or visit http:www.lcr43.com for Delay schedule
Delay 1 Hour
63
Fish Creek Road
Just East of Carriage Drive Just West of Carriage Drive NEW:
07/28/15
12:00 AM
08/14/15
07:00 PM
Kyle Arend
970-498-5734
Utility construction work. Full Closure Full Closure - Use Detour Route
63
Fish Creek Road
Johnson Drive Sketch Box Lane 07/23/15
07:00 AM
09/01/15
07:00 PM
Kyle Arend
970-498-5734
Flood recovery utility work. Full Closure Full Closure
Detour map
17
Shields Street
Vine Drive Willox Lane 02/02/15
12:00 AM
08/24/15
07:00 PM
Erich Purcell
970498-5733
Larimer County is removing and replacing the existing bridge over the Pourde River and also reconstructing CR 17 (Shields Street from Vine Drive to Willox Lane. The Poudre River Bridge will be removed on Monday February 16, 2015. All businesses and residents south of the Poudre River will have access from Vine Drive. All businesses and residents north of the Poudre River will have access from Willox Lane. Please follow the detour routes. Full Closure Detour route in place during closure
Detour map